The global stopping point of the cutting-edge knowledge service industry
Development outline
LocationSongdo-dong, Yeonsu-gu, Incheon
Area 53.36㎢
Project cost21,544.2 billion
Business period2003 to 2030
Planned population265,611
Development plan
Bio-IndustryDevelop a bio-front where international hospitals, bio industry·research complex are accumulated
Education·ResearchEstablish a groundwork for converging technology type industry innovation cluster with the accumulation of the global prestigious educational institution and research complex
Culture·TourismEstablish a high-quality cultural resort by creating facilities such as an art center, venue for rock and popular music, leisure facility near the water, etc.
MICE IndustryEstablish the second level of Convensia, create MICE complex and promote a global convention specialized in linking international organizations
A new concept of business town where work and residence coexist
Development outline
LocationGyeongseo, Yeonhui, and Wonchang-dong, Seo-gu, Incheon
Area 17.81㎢
Project cost6,596 billion
Business period2003 to 2021
Planned population98,060
Development plan
International WorkSelects a theme of industry, such as finance and insurance, to attract the related business facilities (a division of roles through the creation of finance cluster with a wide area of Yeouido (functions as back-office))
Robot IndustryCreate robot R&D industry·research complex and robot theme park
Manufactured PartsA manufactured parts research·production district based on IHP, GM Korea site, etc.
Tourism DistributionCreate a large scale shopping distribution tourism complex to attract both domestic and international tourists
As the stopping point of the cutting-edge parts global anchor company and hydrogen industry, attract the related companies, such as the companies that utilized the demonstration exemption for the special zone of deregulation
The global stopping point of the cutting-edge knowledge service industry
Development outline
LocationSongdo-dong, Yeonsu-gu, Incheon
Area 53.36㎢
Project cost21,544.2 billion
Business period2003 to 2030
Planned population265,611
Development plan
Bio-IndustryDevelop a bio-front where international hospitals, bio industry·research complex are accumulated
Education·ResearchEstablish a groundwork for converging technology type industry innovation cluster with the accumulation of the global prestigious educational institution and research complex
Culture·TourismEstablish a high-quality cultural resort by creating facilities such as an art center, venue for rock and popular music, leisure facility near the water, etc.
MICE IndustryEstablish the second level of Convensia, create MICE complex and promote a global convention specialized in linking international organizations
The center of future automobile and robot industry’s innovative ecosystem
Development outline
LocationHyeonpung and Yuga-eup, Dalseong-gun, Daegu
Area 7.26㎢
Project cost17,233 billion
Business period2006 ~ 2021
Planned population50,025
Development plan
Establish the inland cutting-edge science belt (special zone for R&D) that connects Daejeon-Gwangju-Daegu by the accumulation of research organizations
Create a future cutting-edge complex city that combined residence, education, culture, and leisure functions
The cutting-edge medical R&D hub for a new drug, medical device development, etc.
Development outline
LocationSinseo-dong, Dong-gu, Daegu
Area 1.05㎢
Project cost4,038 billion
Business period2007 to 2015
Planned population2,596
Development plan
Develop new drugs and medical devices and create the best condition for clinical tests by establishing facilities such as clinical test new drug production center, cutting-edge medical device development support center, new drug development support center, etc.
LocationThe whole area of Daeheung-dong, Suseong-gu, Daegu
Area 0.98㎢
Project cost6,179 billion
Business period2008 ~ 2019
Planned population4,648
Development plan
Specialized hospitals, organizations related to medical facilities, health tourism facilities
Cutting-edge IT companies, etc.
Gyeongbuk Gyeongsan Knowledge Industry DistrictGo to Homepage
Create a cutting-edge knowledge industry district where the next generation construction machine, parts, cutting-edge medical devices, and research complex are combined
Develop a complex for distribution · commerce · residence
Development outline
LocationHwayang-myeon, Yeosu-si, Jeollanam-do
Area 2.32㎢
Project cost7,500 billion
Business period2008 ~ 2021
Planned population 25,314
Development plan
Plan for promoting as the hub for domestic smart distribution and the hydrogen economy
Establish a business model that utilized the geographical advantage (Pyeongtaek Harbor, Korea’s largest exportation and importation harbor, LNG stopping point, etc.)
The best location for distribution and tourism industry with the world-class airport facility
Development outline
LocationYeongjong, Yongyudo, Jung-gu
Area 51.26㎢
Project cost123,898 billion
Business period2003 to 2027
Planned population183,762
Development plan
Complex TourismDevelop a Korean model of complex resort targeting family units and the tourism complex such as ocean leisure linking the Marina District
Aviation DistributionFocus on supporting the Incheon International Airport to become the hub airport of the international parcels
Aviation IndustryThe aviation industry cluster where educational institution and manufacturing·research facilities related to aviation are accumulated
Construct a mega-hub port centered on the northeast Asia regions and a background city for the cutting-edge complex logistics district that supports the harbor
Development outline
LocationAll areas of Songjeong-dong, Gangseo-gu, Busan, and Yongwon-dong, Jinhae-gu, Changwon-si, Seongbuk-dong
Area 11.11㎢
Project cost53,126 billion
Business period2000 to 2025
Planned population19,048
Development plan
Construct a mega-hub port for northeast Asia and a logistics hub port
Construct a cutting-edge complex logistics base that supports a function of port and a background city
Contribute to promoting a harbor physical industry to grow as the leading marine city
As the stopping point of the cutting-edge parts global anchor company and hydrogen industry, attract the related companies, such as the companies that utilized the demonstration exemption for the special zone of deregulation
The global stopping point of the cutting-edge knowledge service industry
Development outline
LocationSongdo-dong, Yeonsu-gu, Incheon
Area 53.36㎢
Project cost21,544.2 billion
Business period2003 to 2030
Planned population265,611
Development plan
Bio-IndustryDevelop a bio-front where international hospitals, bio industry·research complex are accumulated
Education·ResearchEstablish a groundwork for converging technology type industry innovation cluster with the accumulation of the global prestigious educational institution and research complex
Culture·TourismEstablish a high-quality cultural resort by creating facilities such as an art center, venue for rock and popular music, leisure facility near the water, etc.
MICE IndustryEstablish the second level of Convensia, create MICE complex and promote a global convention specialized in linking international organizations
The center of future automobile and robot industry’s innovative ecosystem
Development outline
LocationHyeonpung and Yuga-eup, Dalseong-gun, Daegu
Area 7.26㎢
Project cost17,233 billion
Business period2006 ~ 2021
Planned population50,025
Development plan
Establish the inland cutting-edge science belt (special zone for R&D) that connects Daejeon-Gwangju-Daegu by the accumulation of research organizations
Create a future cutting-edge complex city that combined residence, education, culture, and leisure functions
Pohang Convergence Technology Industry DistrictGo to Homepage
A global convergence technology R&D hub for cutting-edge technology development and industrialization
Development outline
LocationDalian and Lee In-ri, Heunghae-eup, Buk-gu, Pohang, Gyeongsangbuk-do
Area 1.48㎢
Project cost3,789 billion
Business period2008 ~ 2022
Planned population10,249
Development plan
Create an R&D specialized district for bio, parts, materials, green energy, etc.
Create 3·4th generation light source connecting facility, green new material developing support facility, and business facility
Secure alternative energy and improve energy efficiency through the smart grid
Development outline
LocationAll areas of Seokjeong, Jiseok, Apchon, and Daeji-dong, Nam-gu, Gwangju
Area 0.93㎢/0.49㎢
Project cost2,978 billion/1,332 billion
Business period2015 ~ 2021
Planned population4,613/2,685
Development plan
By improving the energy efficiency centered on the energy ICT convergence fields and specializing in the smart grid field, promote the smart convergence energy new industry
Create the energy convergence complex and energy-specialized R&D complex
A new concept of business town where work and residence coexist
Development outline
LocationGyeongseo, Yeonhui, and Wonchang-dong, Seo-gu, Incheon
Area 17.81㎢
Project cost6,596 billion
Business period2003 to 2021
Planned population98,060
Development plan
International WorkSelects a theme of industry, such as finance and insurance, to attract the related business facilities (a division of roles through the creation of finance cluster with a wide area of Yeouido (functions as back-office))
Robot IndustryCreate robot R&D industry·research complex and robot theme park
Manufactured PartsA manufactured parts research·production district based on IHP, GM Korea site, etc.
Tourism DistributionCreate a large scale shopping distribution tourism complex to attract both domestic and international tourists
Automobile parts, machine, shipbuilding equipment, and cutting-edge parts materials industry cluster
The center of cutting-edge research facilities, such as hydromechanics Research Lab at FAU (Friedrich Alexander University in Germany), Mieum R&D research special zone, etc.
The cutting-edge medical R&D hub for a new drug, medical device development, etc.
Development outline
LocationSinseo-dong, Dong-gu, Daegu
Area 1.05㎢
Project cost4,038 billion
Business period2007 to 2015
Planned population2,596
Development plan
Develop new drugs and medical devices and create the best condition for clinical tests by establishing facilities such as clinical test new drug production center, cutting-edge medical device development support center, new drug development support center, etc.
Yeonghceon Cutting-edge Material and Component IndustryGo to Homepage
A global hub for the advanced transportation machine material and component industry
Development outline
LocationThe whole area of Guam-ri, Geumho-eup, Chaesin-dong, Bonchon-dong, Yeongcheon-si, Gyeongsangbuk-do
Area 1.46㎢
Project cost2,062 billion
Business period2008 ~ 2013
Development plan
Create Korea’s largest material and component industry cluster
Commercialize a cutting-edge technology based on various R&D, such as machine metal, automobile, etc.
Create a cutting-edge convergence industry district
Development outline
LocationThe whole area of Okgye-myeon, Gangneung-si, Gangwon-do
Area 0.38㎢
Project cost595 billion
Business period2013 ~ 2024
Development plan
Attract the companies related to the cutting-edge materials and components such as special aluminum, etc., and promote the nonferrous metal cluster through the connection with the adjacent R&D organizations
As the stopping point of the cutting-edge parts global anchor company and hydrogen industry, attract the related companies, such as the companies that utilized the demonstration exemption for the special zone of deregulation
The global stopping point of the cutting-edge knowledge service industry
Development outline
LocationSongdo-dong, Yeonsu-gu, Incheon
Area 53.36㎢
Project cost21,544.2 billion
Business period2003 to 2030
Planned population265,611
Development plan
Bio-IndustryDevelop a bio-front where international hospitals, bio industry·research complex are accumulated
Education·ResearchEstablish a groundwork for converging technology type industry innovation cluster with the accumulation of the global prestigious educational institution and research complex
Culture·TourismEstablish a high-quality cultural resort by creating facilities such as an art center, venue for rock and popular music, leisure facility near the water, etc.
MICE IndustryEstablish the second level of Convensia, create MICE complex and promote a global convention specialized in linking international organizations
Automobile parts, machine, shipbuilding equipment, and cutting-edge parts materials industry cluster
The center of cutting-edge research facilities, such as hydromechanics Research Lab at FAU (Friedrich Alexander University in Germany), Mieum R&D research special zone, etc.
The cutting-edge medical R&D hub for a new drug, medical device development, etc.
Development outline
LocationSinseo-dong, Dong-gu, Daegu
Area 1.05㎢
Project cost4,038 billion
Business period2007 to 2015
Planned population2,596
Development plan
Develop new drugs and medical devices and create the best condition for clinical tests by establishing facilities such as clinical test new drug production center, cutting-edge medical device development support center, new drug development support center, etc.
Pohang Convergence Technology Industry DistrictGo to Homepage
A global convergence technology R&D hub for cutting-edge technology development and industrialization
Development outline
LocationDalian and Lee In-ri, Heunghae-eup, Buk-gu, Pohang, Gyeongsangbuk-do
Area 1.48㎢
Project cost3,789 billion
Business period2008 ~ 2022
Planned population10,249
Development plan
Create an R&D specialized district for bio, parts, materials, green energy, etc.
Create 3·4th generation light source connecting facility, green new material developing support facility, and business facility
Gyeongbuk Gyeongsan Knowledge Industry DistrictGo to Homepage
Create a cutting-edge knowledge industry district where the next generation construction machine, parts, cutting-edge medical devices, and research complex are combined
Construct a mega-hub port centered on the northeast Asia regions and a background city for the cutting-edge complex logistics district that supports the harbor
Development outline
LocationAll areas of Songjeong-dong, Gangseo-gu, Busan, and Yongwon-dong, Jinhae-gu, Changwon-si, Seongbuk-dong
Area 11.11㎢
Project cost53,126 billion
Business period2000 to 2025
Planned population19,048
Development plan
Construct a mega-hub port for northeast Asia and a logistics hub port
Construct a cutting-edge complex logistics base that supports a function of port and a background city
Contribute to promoting a harbor physical industry to grow as the leading marine city
As the stopping point of the cutting-edge parts global anchor company and hydrogen industry, attract the related companies, such as the companies that utilized the demonstration exemption for the special zone of deregulation
Create a cutting-edge convergence industry district
Development outline
LocationThe whole area of Okgye-myeon, Gangneung-si, Gangwon-do
Area 0.38㎢
Project cost595 billion
Business period2013 ~ 2024
Development plan
Attract the companies related to the cutting-edge materials and components such as special aluminum, etc., and promote the nonferrous metal cluster through the connection with the adjacent R&D organizations
Yeonghceon Cutting-edge Material and Component IndustryGo to Homepage
A global hub for the advanced transportation machine material and component industry
Development outline
LocationThe whole area of Guam-ri, Geumho-eup, Chaesin-dong, Bonchon-dong, Yeongcheon-si, Gyeongsangbuk-do
Area 1.46㎢
Project cost2,062 billion
Business period2008 ~ 2013
Development plan
Create Korea’s largest material and component industry cluster
Commercialize a cutting-edge technology based on various R&D, such as machine metal, automobile, etc.
Pohang Convergence Technology Industry DistrictGo to Homepage
A global convergence technology R&D hub for cutting-edge technology development and industrialization
Development outline
LocationDalian and Lee In-ri, Heunghae-eup, Buk-gu, Pohang, Gyeongsangbuk-do
Area 1.48㎢
Project cost3,789 billion
Business period2008 ~ 2022
Planned population10,249
Development plan
Create an R&D specialized district for bio, parts, materials, green energy, etc.
Create 3·4th generation light source connecting facility, green new material developing support facility, and business facility
Gyeongbuk Gyeongsan Knowledge Industry DistrictGo to Homepage
Create a cutting-edge knowledge industry district where the next generation construction machine, parts, cutting-edge medical devices, and research complex are combined
Future automobile parts valley to become the global No.1
Development outline
LocationNokjeon-dong and Hwasan-myeon, Yeongcheon-si, Gyeongsangbuk-do
Area 1.22㎢
Project cost2,453 billion
Business period2008 ~ 2022
Development plan
Knowledge-based manufacturing industry specialized district (create a cutting-edge mechatronics industrial district and cutting-edge distribution center for intelligent automobile production)
The center of Korea’s largest automobile parts valley
Develop a complex for distribution · commerce · residence
Development outline
LocationHwayang-myeon, Yeosu-si, Jeollanam-do
Area 2.32㎢
Project cost7,500 billion
Business period2008 ~ 2021
Planned population 25,314
Development plan
Plan for promoting as the hub for domestic smart distribution and the hydrogen economy
Establish a business model that utilized the geographical advantage (Pyeongtaek Harbor, Korea’s largest exportation and importation harbor, LNG stopping point, etc.)
The best location for distribution and tourism industry with the world-class airport facility
Development outline
LocationYeongjong, Yongyudo, Jung-gu
Area 51.26㎢
Project cost123,898 billion
Business period2003 to 2027
Planned population183,762
Development plan
Complex TourismDevelop a Korean model of complex resort targeting family units and the tourism complex such as ocean leisure linking the Marina District
Aviation DistributionFocus on supporting the Incheon International Airport to become the hub airport of the international parcels
Aviation IndustryThe aviation industry cluster where educational institution and manufacturing·research facilities related to aviation are accumulated
A new concept of business town where work and residence coexist
Development outline
LocationGyeongseo, Yeonhui, and Wonchang-dong, Seo-gu, Incheon
Area 17.81㎢
Project cost6,596 billion
Business period2003 to 2021
Planned population98,060
Development plan
International WorkSelects a theme of industry, such as finance and insurance, to attract the related business facilities (a division of roles through the creation of finance cluster with a wide area of Yeouido (functions as back-office))
Robot IndustryCreate robot R&D industry·research complex and robot theme park
Manufactured PartsA manufactured parts research·production district based on IHP, GM Korea site, etc.
Tourism DistributionCreate a large scale shopping distribution tourism complex to attract both domestic and international tourists
The global stopping point of the cutting-edge knowledge service industry
Development outline
LocationSongdo-dong, Yeonsu-gu, Incheon
Area 53.36㎢
Project cost21,544.2 billion
Business period2003 to 2030
Planned population265,611
Development plan
Bio-IndustryDevelop a bio-front where international hospitals, bio industry·research complex are accumulated
Education·ResearchEstablish a groundwork for converging technology type industry innovation cluster with the accumulation of the global prestigious educational institution and research complex
Culture·TourismEstablish a high-quality cultural resort by creating facilities such as an art center, venue for rock and popular music, leisure facility near the water, etc.
MICE IndustryEstablish the second level of Convensia, create MICE complex and promote a global convention specialized in linking international organizations
The best location for distribution and tourism industry with the world-class airport facility
Development outline
LocationYeongjong, Yongyudo, Jung-gu
Area 51.26㎢
Project cost123,898 billion
Business period2003 to 2027
Planned population183,762
Development plan
Complex TourismDevelop a Korean model of complex resort targeting family units and the tourism complex such as ocean leisure linking the Marina District
Aviation DistributionFocus on supporting the Incheon International Airport to become the hub airport of the international parcels
Aviation IndustryThe aviation industry cluster where educational institution and manufacturing·research facilities related to aviation are accumulated
Create the core district to establish the hydrogen automobile parts cluster, which is the future automobile industry
Development outline
LocationWhole area of Jungsan-dong, Buk-gu, Ulsan
Area 0.69㎢
Project cost903 billion
Business period2013~ 2017
Planned population1,461
Development plan
Establish the hydrogen automobile parts cluster by attracting hydrogen automobile parts producing anchor companies and other related companies
The demonstration business and inspection related to the hydrogen parts, and establish a cooperation system for parts production by creating a network with the adjacent automobile parts production industry comple